Information-Mapping Guide

The Coordinator Workflow Guide

The full transaction journey along the 7‑C spine — each C expands to its Phases, each Phase to its Processes (with one established Milestone), each Process to its Procedures. Every procedure is tagged by owner (Listing vs Contract-to-Close Coordinator) and by type (generic transaction-coordinator work vs TPJG-designed). Exceptions live in their own column.

Coordinator swimlanes (Owner)

LC Listing Coordinator — Contact → Cultivate (seller-side)
CC Contract-to-Close Coordinator — Contract → Close (both sides)
LC->CC Handoff seam — data originates in the LC file, CC records it
Agent Producing / Lead Agent   Director org-level   Both LC & CC (Culture)

Work type & status

Generic TC any realtor / Transactly auto-plan default
TPJG designed by The Property Joes Group
Generic TC+ TPJG generic base with a TPJG overlay (overlay shown in the Exceptions column)
SOP current, sourced   DESIGN Joseph's forward design (awaiting bless)   FLAG gap / discrepancy to surface
C1

CONTACT

intake / relationship in
5 procedures
Lead Intake & Capture
Relationship Capture
Milestone Relationship Captured
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Enter all parties in the TC system; UPSERT relationships Agent Generic TC+ TPJG SOP
TPJG: use the UPSERT-Contact-Procedure in ReferralMaker (T)
CRM entry in ReferralMaker with source attribution LC TPJG SOP
Source options: HAR / Homes / Luxury Presence / BNI / OH
Notify agent (!SIGNAL_INTAKE_LIST + team text) LC TPJG SOP
Daily lead logging LC TPJG SOP
Inbound capture + qualification classification (Lead vs SOI) Agent TPJG SOP
Speed-of-Response by price band: <$500K minutes || $900K+ counsel-not-urgency / 20-min Architectural Listening
C2

CULTIVATE

nurture + full listing prep
39 procedures
Nurture
Lead Nurture
Milestone Lead Nurtured (PROVISIONAL)
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Drip assignment (automated, matched to timeline) LC TPJG FLAG
Listing Intake & Setup
Listing File Build
Milestone Listing File Built
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Intake review of Submit-to-Coordinator Form (address/seller/agent/vacant-occupied/go-live) LC TPJG SOP
Address verification in Jointly against executed Listing Agreement (use its address) LC TPJG SOP
Project/folder setup Client_[Address/Seller] + Marketing Log + Feature List LC TPJG SOP
Obtain signatures on required disclosures LC Generic TC SOP
Order title LC Generic TC+ TPJG SOP
Only if applicable || TPJG: Open Title early to surface vesting (T)
Order Home Warranty LC Generic TC SOP
Only if applicable
Net Sheet creation (avg CMA) LC TPJG SOP
Listing Production
Property Marketing Prep
Milestone Property Marketing-Ready
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Schedule stagers + photographers LC Generic TC+ TPJG SOP
TPJG: CommonGround, Daytime 32-photo, 4PM default, no aerials (T)
Order sign install LC Generic TC+ TPJG SOP
TPJG: SignBoss exact rider spec + 6ft white PVC (T). Vendor = Sign Boss Inc.
Assign lockbox code from ClickUp inventory; match ID to agent photo LC TPJG SOP
Create Google Photos album HOME: Address/Seller LC TPJG SOP
Create 2D floor plan (CubiCasa) and add to Disclosures Agent TPJG SOP
Onsite walkthrough + author owner-availability Showing Instruction LC TPJG SOP
TEST access via call-box FIRST before walkthrough (Joseph 2026-07-03)
MLS Input & Activation
MLS Build
Milestone MLS Draft Ready
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Input listing into MLS; upload photos + disclosures LC Generic TC+ TPJG FLAG
TPJG: co-agent cross-assign Joe<->Keri, Supervisor Roger Aad, Agent Remarks template (T)
Set up showing instructions + assign lockbox to MLS LC Generic TC+ TPJG SOP
TPJG: NEVER place Supra/combo code; ShowingTime must match MLS status (T)
Create Offer Instructions flyer (Jointly) and attach to MLS + Agent Remarks link LC TPJG SOP
Generate photo captions (ChatGPT) LC TPJG SOP
Register Supra + add agent to notifications LC TPJG SOP
Listing Go-Live
Milestone Listing Active
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Draft approval flow: MLS draft -> Joe -> seller (approved template) -> group-text intro LC TPJG SOP
Submit for Compliance (listing side) LC Generic TC+ TPJG SOP
TPJG: file within 3 days (T)
Activate listing once seller approves LC Generic TC SOP
Email seller introducing self as agent's TC LC Generic TC SOP
Active Listing Management
Listing Maintenance
Milestone Listing Maintained (standing — no terminal milestone; exit event = Listing Under Contract)
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Maintain while active (price changes, OH updates) LC Generic TC SOP
Send Homes.com weekly seller reports until sold; schedule 3D/Matterport LC TPJG SOP
Upload floor plan to Disclosures; promote #NewToMarket Agent TPJG SOP
Tuesday Video Update (ShowingSmart activity/feedback) Agent TPJG SOP
Open House Coordination
Open House Execution
Milestone Open House Run
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Find host (Host Roster tab); post in mykw.kw.com LC TPJG SOP
Enter OH in MLS; add initials + time to OH sheet LC TPJG SOP
Create Google Calendar OPEN HOUSE - [Address/Seller] (host + listing agent + Joe always + seller) LC TPJG SOP
Email OH Instructions + Progress Log link + BombBomb video LC TPJG SOP
Gated community: leave index card at gate (can't post number on HAR)
Schedule Monday 8 AM reminder email (hosts BCC) LC TPJG SOP
Post-OH: host completes results to LOG; send to seller LC TPJG SOP
Buyer Showing Tour
Tour Delivery
Milestone Tour Delivered
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Pre-tour vetting (5 Qs per listing agent) + route sequencing (review-only) Agent TPJG SOP
Build Tour Summary (copied Client Log template, print, send to AAA) LC TPJG SOP
Pre-Listing intelligence (Agent-owned, before consult): CMA (HAR/Realist), ShowingSmart demand cohorts, Price-Condition-Location Triangle, Location Derogatory Checklist, 'Next to Go Under Contract' (review-only) Agent TPJG SOP
Investor/Distressed variant: carry-cost net sheet, frank scripts
Relist (Expect the Unexpected)
Relist Execution
Milestone Listing Relisted
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Listing Amendment FIRST (Box F) before relist LC TPJG SOP
Whole process is an exception process (relist)
Terminate original today; immediately activate new (no gap); re-upload all attachments manually LC TPJG SOP
Send two emails: seller + telemarketing/data cos (Vulcan7/RedX/Mojo) AFTER relist LC TPJG SOP
PENDING rider ordered only if property >= $500K
C3

CONTRACT

offer → executed → repairs
29 procedures
Contract Execution & Distribution
Contract Receipt & Distribution
Milestone Contract Receipted
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Review executed contract/addenda/disclosures for missing sigs; obtain missing (agent ultimately responsible) CC Generic TC SOP
Send contract-package intro emails to clients + all parties CC Generic TC SOP
Obtain client sigs on agent-approved forms CC Generic TC SOP
Create transaction + submit all docs to broker compliance (Dotloop) CC Generic TC SOP
Update COORDINATOR: Client Current Status + execution date CC TPJG SOP
Send Cyber-Fraud notice to BOTH buyer + seller CC TPJG SOP
Enter client + co-agent + transaction team (title/lender) in TC system CC Generic TC+ TPJG SOP
TPJG: UPSERT in ReferralMaker (T)
Change MLS status to Pending / under contract CC Generic TC+ TPJG SOP
TPJG: Seller confirm listing accuracy; Buyer disable custom searches (T)
Transaction Logging
Milestone Transaction Logged
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Add to Transactions master calc sheet at post-contract (Transactly PENDING, CDA TBD, referral %) LC->CC TPJG SOP
Escrow & Earnest
Escrow Opening
Milestone Escrow Opened
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Open escrow; order title/warranties/HOA transfers CC Generic TC SOP
Coordinate earnest-money deposit; send receipt to all parties CC Generic TC SOP
Request title report + email to clients CC Generic TC SOP
CC does NOT review the title report
Timeline & Milestone Management
Timeline Setup
Milestone Timeline Established
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Create timeline tracker with all TX deadlines CC Generic TC+ TPJG SOP
TPJG day-counts: Option 7-10d, earnest ~3bd, financing 21-30d (T)
Monitor deadlines/contingencies/MLS-status; schedule inspectors/appraisers/walkthroughs/closings CC Generic TC SOP
Does NOT schedule repair vendors || New Construction: request build schedule; track phases (Contract -> Blue-Tape T-7 -> Final Walk T-1/T-0 -> Close) || Backup offers: notify submitters, take backups w/ correct addenda
Option Period
Option-Period Diligence
Milestone Option Cleared
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Order/attend home inspection; deliver report CC Generic TC+ TPJG SOP
TPJG: sellers allow up to 4 hrs, leave home (T)
Insurance Verification (know insurability before option expires — protects earnest) CC Generic TC+ TPJG SOP
TPJG: moved INTO option period per 2026-01-23 change (T)
Order appraisal CC Generic TC+ TPJG SOP
Only if financed || VA buyers: termite report NOT paid by buyer (A-Action free; resend in seller/co-agent name) (T)
Inspection Negotiation & Repairs
Repair Resolution
Milestone Repairs Resolved
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Draft inspection response/addenda + obtain initials (needs exact verbiage from agent) CC Generic TC SOP
Submit final inspection response to escrow CC Generic TC SOP
Post-repairs: confirm listing accuracy; re-post CDA if changed CC TPJG SOP
Approvals
Credit Approval
Milestone Credit Approved
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Weekly lender follow-up for appraisal/financing status + due dates CC Generic TC SOP
Property Approval
Milestone Property Approved
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Review title commitment (Schedule B & C: liens/easements) CC TPJG SOP
Review survey (encroachments/easements/boundary) CC TPJG FLAG
Request client reviews EARLY at property-approval (while excitement high)
Compliance / CDA
CDA & Compliance Filing
Milestone Compliance Filed
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Open transaction in broker compliance system CC Generic TC+ TPJG SOP
TPJG: ALWAYS enter under Joe's KW Command account (all TPJG agents) (T)
Prepare/upload but DO NOT submit until Offers & Submissions -> Add Offer first CC TPJG SOP
Enter $495 TC/Compliance fee under 'Bonus' in Command CC TPJG FLAG
Send Commission Disbursement Form / request CDA for agent review CC Generic TC+ TPJG SOP
TPJG: email June ([email protected]); specify who + split (T)
Send CDA to title/escrow; ensure completed + sent to agent for signature CC Generic TC SOP
Send Transaction-State notification to Lead Agent + Agent (do NOT email manager@) CC TPJG SOP
CDA calc order: Franchise max $3000 -> 1/4 CAP max $4500 -> Agent-gen 60/40->75/25 after $3.6M / TPJG-gen 40/60->50/50 || 'Commission Update' task repeats 3x (Old Republic/Open Title once — they know structure)
C4

CLOSE

pre-closing → close
15 procedures
Clear-to-Close Gate
Clear-to-Close
Milestone Clear to Close
Procedure Owner TC vs TPJG Status Exceptions / Nuances
CTC Sequencing Gate — do NOT contact title until CTC issued CC TPJG SOP
Obtain CTC; review Closing Disclosure CC Generic TC SOP
Pre-Closing Prep
Closing Preparation
Milestone Closing Prepared
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Order sign removal CC Generic TC+ TPJG SOP
TPJG: SignBoss 'other services'; remove combo/Bluetooth lockbox (T)
Remove pictures #7-#50 from listing + add sold terms CC TPJG SOP
Obtain walkthrough for Listing Agent CC TPJG SOP
Final Walkthrough scheduling + closing-docs review + utilities CC Generic TC SOP
Send Keys/Keypads/Whereabouts email CC TPJG SOP
Send one week prior
Wire Verification by PHONE (fraud prevention) CC TPJG SOP
Remote/Online closing: balance title + lender 3 business days prior (margin for holidays)
Closing Cadence
Closing Cadence
Milestone Closing Confirmed
Procedure Owner TC vs TPJG Status Exceptions / Nuances
One-Week / 3-Days / 2-Days-Before-Closing email cadence (Fed wire #, amount, cutoff) CC Generic TC+ TPJG SOP
TPJG: aim close before noon || Remove cadence if WE are the buyer (T)
Utilities/moving reminder to buyer CC TPJG SOP
Start 1 business day before possession
Send closing-task reminders (address/utility changes) CC Generic TC SOP
Closing Day
Close & Fund
Milestone Closed & Funded
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Confirm all docs signed, funded, recorded CC Generic TC SOP
Close before 2PM to fund same day
Key/code transfer CC Generic TC SOP
Retrieve + store receipts/documentation; confirm closing CC Generic TC SOP
Send final settlement statement + congratulations to clients CC Generic TC SOP
Joe reviews settlement statement BEFORE client sees it || Estate/Probate 3-phase variation: payoff+per diem, heir waivers, reconcile
C5

CURATE

post-close + deepen relationship
10 procedures
Post-Close Reset
File Close & Reset
Milestone File Closed & Reset
Procedure Owner TC vs TPJG Status Exceptions / Nuances
BUYER: disable MLS searches -> convert to purchase CMA; TODO CMA every 6 weeks from anniversary; UPSERT primary address CC TPJG SOP
SELLER: UNREGISTER lockbox w/ written confirmation; remove Supra notification via SupraWeb w/ written confirmation CC TPJG SOP
Close Client Books (review-only) Agent TPJG SOP
Send closing docs -> Accounting + confirm funding; confirm brokerage check (E&O + charitable) CC TPJG SOP
Send Thank You / online review request + HAR Client Experience Rating CC Generic TC+ TPJG SOP
TPJG: review solicitation + HAR rating on top of the generic thank-you (T)
Post to social; remove procedure CC TPJG SOP
Sphere/Client reclassification CC TPJG SOP
Sort D = skip; else set SPHERE:CLIENT + Sort A
Relationship Nurture (CNPE)
Client Retention
Milestone Post-Close Follow-Up Initiated (standing cadence — no terminal milestone)
Procedure Owner TC vs TPJG Status Exceptions / Nuances
Closing-day thank-you (handwritten note) (review-only) Agent TPJG SOP
Follow-up cadence: 30d call / 60d market update / 90d check-in + referral request (review-only) Agent TPJG SOP
Ongoing cadence: VIP monthly, SOI quarterly, Partner bi-annual (review-only) Agent TPJG FLAG

C6 — CORPORATE

org frame · not a client journey

C7 — CULTURE

communication standards · governs every action

Open Decisions for Joseph

Design choices & flagged discrepancies surfaced by the guide — recommendations shown, nothing auto-picked.

D1 DESIGN
Bless the Lead-Coordinator layer
Approve the net-new Lead-Coordinator role: owns the milestone spine, ROUTES coordinator sub-tasks to LC (Contact->Cultivate) or CC (Contract->Close), REVIEWS (not routes) Agent/Director-owned milestones (Tour Delivered, Client Retained), sits in the REVIEWER role, and uses the existing Tuesday lead-agent meeting as its review cadence. Everything past 'owns milestones + routes/reviews tasks' is your forward design with no SOP behind it.
Recommendation: Bless scope so we can build the routing/review layer.
D2 FLAG
Who owns the ongoing Curate cadence?
Post-close nurture (VIP monthly / SOI quarterly / Partner bi-annual) currently has no coordinator owner — it sits with Agent/Team. Should a coordinator (CC or a Curate coordinator) own the ongoing cadence, or does it stay Agent-owned?
Recommendation: Assign to CC or a dedicated Curate owner for consistency.
D3 FLAG
Resolve the supervisor discrepancy
Two supervisors are cited: Roger Aad (MLS input) vs Mitch Rainey (showing instructions). Which is correct, or is each correct for its own step?
Recommendation: Confirm the split; likely step-specific.
D4 FLAG
Codify the $495 TC fee rule
The $495 TC/Compliance fee is 'almost always charged' but is NOT stated in the Coordinator Agreement, and waived exceptions exist. Make it a default-with-documented-exceptions rule, or leave case-by-case?
Recommendation: Codify as default $495 + documented waiver list.
D5 FLAG
Decompose the thin CULTIVATE-nurture Process
The Lead Nurture Process has only 1 procedure row (Drip Assignment); its milestone is PROVISIONAL. The CNPE cadence + Buyer/Seller-Readiness sub-flows exist in the canonical definition but are not decomposed into procedure rows. Approve a decomposition pass (and confirm LC ownership of the cadence)?
Recommendation: Run a decomposition pass so 'Lead Nurtured' is a real milestone, not a one-row placeholder.